Lascelles Precinct
Lascelles Wharf
1. Berth No.1
Primary cargo: Bulk clinker, sulphuric acid and fertiliser
Attributes
- Dredged Depth: 12.3m
- LOA Range (No.1 Berth): 190m – 200m
- Maximum Axle Load: 14.4 tonnes
- Apron Width: 31m (to No.1 Shed)
- Construction Date: 1967
Wharf Construction Type
- Reinforced concrete deck with concrete superstructure, supported on concrete piles
Berthing and Mooring Structure Type
- Timber-piled spring fendering with rubber cylindrical fenders
- Mooring dolphin with steel piles and concrete dolphin cap
- Wharf-mounted bollards
2. Berth No.2
Primary cargo: Fertiliser and phosphate rock
Attributes
- Dredged Depth: 12.3m
- LOA Range (No.1 Berth): 190 – 200m
- Maximum Axle Load: 14.4 tonnes
- Apron Width: 15.4m (to wharf conveyor)
- Construction Date: 1953 (widened 1957)
Wharf Construction Type
- Reinforced concrete deck with timber superstructure, supported on timber piles
Berthing and Mooring Structure Type
- Timber-piled spring fendering with rubber cylindrical fenders
- Wharf-mounted bollards
3. Berth No.3
Primary cargo: Calcite, fertiliser, livestock, grain and project cargo
Attributes
- Dredged Depth: 12.3m
- LOA Range (No.1 Berth): 190m – 200m
- Maximum Axle Load:
- 23.6 tonnes (Normal Duty)
- 53 tonnes (Heavy Duty – southern 60m of berth)
- Apron Width: 15.4m (to wharf conveyor)
- Construction Date: 1983
Wharf Construction Type
- Reinforced concrete deck over earth fill
Berthing and Mooring Structure Type
- Rubber Seibu fenders
- Land-based mooring point to the north of berth
- Wharf-mounted bollards
Fixed Plant
- Self-Unloading Vessel Hopper: 3,000 tph
- WCI-1 Wharf Conveyor (Reversible): 3,000 tph
- CI-1 Wharf Conveyor 3,000 tph
- CI-2 Rising Conveyor (to No.2 Shed): 3,000 tph
- CV-1 Rising Conveyor (to No.1 Shed): 1,200 tph
4. Shed No.1
Primary cargo: Phosphate rock
Attributes
- Overall Dimensions: 171m x 53m
- Floor Area: 9,060 m2
- Maximum Ext. Height: 22.1m
- Stockpile Height: 14.8m (max)
- Bays: 3
- Nominal Capacity:
- 61,500 m3
- 80,000t (@1.3t/m3)
Shed Construction
- Steel frame, steel cladding, asphalt floor
Fixed Plant
- CV-2 Ridge Conveyor: 1,200 tph
- CV-3 Reclaim Conveyor: 300 tph
- Dust Collectors
Doors
- North Wall: 4.5m H x 4.5m W
- East Wall: 4.5m H x 4.5m W
5. Shed No.2
Primary cargo: Bulk materials
Attributes
- Overall Dimensions: 155m x 45m
- Floor Area: 6,900 m2
- Maximum Ext. Height: 22.5m
- Stockpile Height: 12.0m (max)
- Bays: 3
- Nominal Capacity:
- 31,250 m3
- 50,000t (@1.6t/m3)
- [20,000/15,000/20,000]
Shed Construction
- Steel frame, steel cladding, segmental pavement floor
Fixed Plant
- CI-3 Ridge Conveyor: 3,000 tph
- Outloading via batch-weighed truck loader
- Dust Collectors
Mobile Hoppers (2 No.) – Rail Mounted
- Nominal Capacity: 40m3
Lascelles Wharf Supporting Infrastructure
- Stormwater reticulation and sediment pits
- Sewer Reticulation and pumping stations
- Water Reticulation, including pipework, hydrants, hydrant boosters and backflow prevention devices
- Electrical reticulation including substations, switchboard, HV and LV cabling and lighting
- Copper and OF data and communications cabling
- Security fencing and gates
- Workshops, amenities and office buildings
- Access walkways and handrail
- Seawalls and Revetments
- Carparks
Refinery Pier
1. No.1 Berth and Approach / 2. No.2 Berth and Approach
Primary cargo: Petroleum Products (light fuel)
Attributes
- Dredged Depth: 12.3m
- LOA Range (No.1 Berth): 101m – 204m
- LOA Range (No.2 Berth): 153m – 204m
- Maximum Axle Load: 11.2 tonnes
- Length
- Approach: 185m
- Pier-head: 37m
- Construction Date: 1957
Jetty Construction
- Reinforced concrete deck with steel superstructure, supported on timber piles
Berthing and Mooring Structures
- 4 mooring dolphins (2 shared with No.2 Berth)
- 3 berthing dolphins with rubber cone fenders
3. No.3 Berth and Approach / 4. No.4 Berth and Approach
Primary cargo
- No.3 Berth: Bitumen, AvGas and bulk chemical
- No.4 Berth: Crude
Attributes
- Dredged Depth: 12.3m
- LOA Range (No.3 Berth): 180m – 245m
- LOA Range (No.4 Berth): 230m – 265m
- Maximum Axle Load: 11.2 tonnes
- Length
- Approach: 409m
- Pier-head: 37m
- Construction Date: 1962
Jetty Construction
- Reinforced concrete deck with steel superstructure, supported on timber piles
Berthing and Mooring Structures
- 4 mooring dolphins (2 shared with No.1 Berth)
- 2 berthing dolphins with rubber cone fenders
Refinery Pier Supporting Infrastructure
- Sewer Reticulation and Holding Tanks
- Water Reticulation, including hydrants, eye wash stations and backflow prevention devices
- Electrical reticulation, including switchboard, LV cabling and lighting
- Security fencing
- Amenities building
- Access walkways and handrail